Hi guys,
I've got compute-1-17 and compute-1-18 NIMBYed for now because I'm
going to move them to make room (physically) to rack 1 to make room for
8 new nodes! (each node has 2x X5560 quad-core 2.8Ghzprocessors and 24GB
of RAM)
Just so nobody un-NIMBY's them.
--
Wm. Josiah Erikson
Assistant Director of IT, Infrastructure Group
System Administrator, School of CS
Hampshire College
Amherst, MA 01002
(413) 559-6091