<html>
<head>
<meta content="text/html; charset=ISO-8859-1"
http-equiv="Content-Type">
</head>
<body bgcolor="#FFFFFF" text="#000000">
Hi folks,<br>
This is today. I will be shutting the cluster down shortly. I
will be in NH tomorrow afternoon and evening, so I probably won't be
able to get the cluster back up again until the 31st.<br>
-Josiah<br>
<br>
<br>
<div class="moz-cite-prefix">On 12/18/14, 11:22 AM, Thomas Helmuth
wrote:<br>
</div>
<blockquote
cite="mid:CABgVVjeEe+4iXHtYTWHMQbamWhddHrne1LfAjShM=uW3EEHi0A@mail.gmail.com"
type="cite">
<div dir="ltr">Thanks for the heads-up Josiah!<br>
</div>
<div class="gmail_extra"><br>
<div class="gmail_quote">On Thu, Dec 18, 2014 at 11:07 AM, Wm.
Josiah Erikson <span dir="ltr"><<a moz-do-not-send="true"
href="mailto:wjerikson@hampshire.edu" target="_blank">wjerikson@hampshire.edu</a>></span>
wrote:
<blockquote class="gmail_quote" style="margin:0 0 0
.8ex;border-left:1px #ccc solid;padding-left:1ex">
<div bgcolor="#FFFFFF" text="#000000"> Hi guys,<br>
Because of the below, I will need to shut down the
cluster entirely on December 29th, and unplug it to
prevent it coming back on automatically when power comes
back (because it'll go out again shortly afterwards). If
I'm around, I'll plug it back in on December 30th after
they're done, or December 31, and email the list after
that happens.<br>
All the best and sorry for the inconvenience.<br>
-Josiah<br>
<br>
<div><br>
<br>
-------- Forwarded Message --------
<table border="0" cellpadding="0" cellspacing="0">
<tbody>
<tr>
<th align="RIGHT" nowrap="nowrap"
valign="BASELINE">Subject: </th>
<td>Power Shutdown and Testing</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap"
valign="BASELINE">Date: </th>
<td>Thu, 18 Dec 2014 09:33:59 -0500</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap"
valign="BASELINE">From: </th>
<td>Larry Archey <a moz-do-not-send="true"
href="mailto:larchey@hampshire.edu"
target="_blank"><larchey@hampshire.edu></a></td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap"
valign="BASELINE">To: </th>
<td>Joanna Olin <a moz-do-not-send="true"
href="mailto:jlcpr@hampshire.edu"
target="_blank"><jlcpr@hampshire.edu></a>,
Raymond E. LaBarre <a moz-do-not-send="true"
href="mailto:rlabarre@mtholyoke.edu"
target="_blank"><rlabarre@mtholyoke.edu></a>,
Lachance, James <a moz-do-not-send="true"
href="mailto:James.Lachance@cafebonappetit.com"
target="_blank"><James.Lachance@cafebonappetit.com></a>,
Chelvanaya B. Gabriel <a moz-do-not-send="true"
href="mailto:cbgNS@HAMPSHIRE.EDU"
target="_blank"><cbgNS@HAMPSHIRE.EDU></a>,
Jason M. Tor <a moz-do-not-send="true"
href="mailto:jtor@hampshire.edu"
target="_blank"><jtor@hampshire.edu></a>,
Bob Crowley <a moz-do-not-send="true"
href="mailto:rlcLO@hampshire.edu"
target="_blank"><rlcLO@hampshire.edu></a>,
Wm. Josiah Erikson <a moz-do-not-send="true"
href="mailto:wjerikson@hampshire.edu"
target="_blank"><wjerikson@hampshire.edu></a>,
Sandy Chessey <a moz-do-not-send="true"
href="mailto:schessey@hampshire.edu"
target="_blank"><schessey@hampshire.edu></a>,
Jennifer Gunter King <a moz-do-not-send="true"
href="mailto:jking@hampshire.edu"
target="_blank"><jking@hampshire.edu></a>,
Byron P. McCrae <a moz-do-not-send="true"
href="mailto:bmccrae@hampshire.edu"
target="_blank"><bmccrae@hampshire.edu></a>,
Pam Tinto <a moz-do-not-send="true"
href="mailto:ptinto@hampshire.edu"
target="_blank"><ptinto@hampshire.edu></a></td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap"
valign="BASELINE">CC: </th>
<td>Carl Weber <a moz-do-not-send="true"
href="mailto:CWeber@hampshire.edu"
target="_blank"><CWeber@hampshire.edu></a>,
Jeff Neumann <a moz-do-not-send="true"
href="mailto:jjnPP@hampshire.edu"
target="_blank"><jjnPP@hampshire.edu></a></td>
</tr>
</tbody>
</table>
<br>
<br>
<pre>Good Morning,
I am writing in advance of posting a campus announcement that power will
be turned off for 3 - 4 hours at FPH, Prescott, Arts Village and Cole
Science on Tuesday morning, December 30 while repairs are being made to
the main electrical switchgear. Generator power will be provided to Cole
Science to maintain critical functions. Power to all other locations on
campus will remain on during that period. The work being done is to
install devices designed to prevent the power outage encountered at
Thanksgiving and to protect critical equipment from being damage from
electrical power surges.
Once the work is completed, the emergency generators will be tested.
This will cause 5 - 7 minute mini outages throughout the campus.
Facilities & Grounds will have electricians on campus to support the
utility firms doing the work.
Thanks,
Larry
--
Lawrence M. Archey
Director of Facilities & Grounds
Hampshire College
Amherst, Ma
(413) 559-5431
</pre>
<br>
</div>
<br>
</div>
<br>
_______________________________________________<br>
Clusterusers mailing list<br>
<a moz-do-not-send="true"
href="mailto:Clusterusers@lists.hampshire.edu">Clusterusers@lists.hampshire.edu</a><br>
<a moz-do-not-send="true"
href="https://lists.hampshire.edu/mailman/listinfo/clusterusers"
target="_blank">https://lists.hampshire.edu/mailman/listinfo/clusterusers</a><br>
<br>
</blockquote>
</div>
</div>
</blockquote>
<br>
<pre class="moz-signature" cols="72">--
-----
Wm. Josiah Erikson
Head, Systems and Networking
Hampshire College
Amherst, MA 01002
</pre>
</body>
</html>