Hi guys,<br>
Because of the below, I will need to shut down the cluster
entirely on December 29th, and unplug it to prevent it coming back
on automatically when power comes back (because it'll go out again
shortly afterwards). If I'm around, I'll plug it back in on December
30th after they're done, or December 31, and email the list after
that happens.<br>
All the best and sorry for the inconvenience.<br>
-Josiah<br>
<br>
<div class="moz-forward-container"><br>
<br>
-------- Forwarded Message --------
<table class="moz-email-headers-table" border="0" cellpadding="0"
cellspacing="0">
<tbody>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">Subject:
</th>
<td>Power Shutdown and Testing</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">Date: </th>
<td>Thu, 18 Dec 2014 09:33:59 -0500</td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">From: </th>
<td>Larry Archey <a class="moz-txt-link-rfc2396E" href="mailto:larchey@hampshire.edu"><larchey@hampshire.edu></a></td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">To: </th>
<td>Joanna Olin <a class="moz-txt-link-rfc2396E" href="mailto:jlcpr@hampshire.edu"><jlcpr@hampshire.edu></a>, Raymond E.
LaBarre <a class="moz-txt-link-rfc2396E" href="mailto:rlabarre@mtholyoke.edu"><rlabarre@mtholyoke.edu></a>, Lachance, James
<a class="moz-txt-link-rfc2396E" href="mailto:James.Lachance@cafebonappetit.com"><James.Lachance@cafebonappetit.com></a>, Chelvanaya B.
Gabriel <a class="moz-txt-link-rfc2396E" href="mailto:cbgNS@HAMPSHIRE.EDU"><cbgNS@HAMPSHIRE.EDU></a>, Jason M. Tor
<a class="moz-txt-link-rfc2396E" href="mailto:jtor@hampshire.edu"><jtor@hampshire.edu></a>, Bob Crowley
<a class="moz-txt-link-rfc2396E" href="mailto:rlcLO@hampshire.edu"><rlcLO@hampshire.edu></a>, Wm. Josiah Erikson
<a class="moz-txt-link-rfc2396E" href="mailto:wjerikson@hampshire.edu"><wjerikson@hampshire.edu></a>, Sandy Chessey
<a class="moz-txt-link-rfc2396E" href="mailto:schessey@hampshire.edu"><schessey@hampshire.edu></a>, Jennifer Gunter King
<a class="moz-txt-link-rfc2396E" href="mailto:jking@hampshire.edu"><jking@hampshire.edu></a>, Byron P. McCrae
<a class="moz-txt-link-rfc2396E" href="mailto:bmccrae@hampshire.edu"><bmccrae@hampshire.edu></a>, Pam Tinto
<a class="moz-txt-link-rfc2396E" href="mailto:ptinto@hampshire.edu"><ptinto@hampshire.edu></a></td>
</tr>
<tr>
<th align="RIGHT" nowrap="nowrap" valign="BASELINE">CC: </th>
<td>Carl Weber <a class="moz-txt-link-rfc2396E" href="mailto:CWeber@hampshire.edu"><CWeber@hampshire.edu></a>, Jeff Neumann
<a class="moz-txt-link-rfc2396E" href="mailto:jjnPP@hampshire.edu"><jjnPP@hampshire.edu></a></td>
</tr>
</tbody>
</table>
<br>
<br>
<pre>Good Morning,
I am writing in advance of posting a campus announcement that power will
be turned off for 3 - 4 hours at FPH, Prescott, Arts Village and Cole
Science on Tuesday morning, December 30 while repairs are being made to
the main electrical switchgear. Generator power will be provided to Cole
Science to maintain critical functions. Power to all other locations on
campus will remain on during that period. The work being done is to
install devices designed to prevent the power outage encountered at
Thanksgiving and to protect critical equipment from being damage from
electrical power surges.
Once the work is completed, the emergency generators will be tested.
This will cause 5 - 7 minute mini outages throughout the campus.
Facilities & Grounds will have electricians on campus to support the
utility firms doing the work.
Thanks,
Larry
--
Lawrence M. Archey
Director of Facilities & Grounds
Hampshire College
Amherst, Ma